Where to expect delays and diversions in days ahead
A4020 Uxbridge Road, London, Hammersmith and Fulham
25 November — 27 November
Delays likely - Traffic control (Stop/Go boards)
Works location: Unknown
Works description: Install 10m of 1 way poly duct in Carriageway,Install 5m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500282993203
Westway, London, Hammersmith and Fulham
27 November — 28 November
Delays likely - Lane closure
Works location: Unknown
Works description: Maintenance of Low Emission Zone system
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG53115001064
A219 Wood Lane, London, Hammersmith and Fulham
21 November — 26 November
Delays likely - Lane closure
Works location: Unknown
Works description: Repair / maintenance of flow monitoring equipment in existing manhole, no excavation
Responsibility for works: THAMES TIDEWAY TUNNEL LTD
Current status: Planned work about to startWorks reference: ZE405000003657
Information supplied by one.network
November 25, 2019
|