A40 Shepherd's Bush Green |
02 September — 03 September |
Delays likely Lane closure |
Works description: Excavate in the CW locate Thames Water valve, make sure valve is operational, backfill and reinstate |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU277000MV6961795-01 |
A4020 Uxbridge Road |
04 September — 05 September |
Delays likely Lane closure |
Works description: Exavate in CW to locate Thames Water valve, make sure valve is operational, backfill and reinstate. Works to be completed at the same as the road closure on Old Oak Road. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU277HCV6987988/6986522 |
B409 Stamford Brook Road |
02 September — 13 September |
Delays likely Traffic control (two-way signals) |
Works description: Thames Water works to Install chamber over 30" water main |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU277PTML224732/02 |
Westway |
02 September — 03 September |
Delays likely Lane closure |
Works description: IronTech Manhole |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430405939 |
|
Old Oak Road |
04 September — 05 September |
Delays likely Road closure |
Works description: Excavate in the C/W approx 1m x 1m square, enable / replace existing valve. Complete reinstatement |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU277000HCV6986522/01 |
|