Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

 

A4020 Uxbridge Road, London, Hammersmith and Fulham

18 February — 01 April
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000802012
A219 Shepherd's Bush Road, London, Hammersmith and Fulham
06 March — 14 March
Delays likely Traffic control (give & take)
Works location: Unknown
Works description: DSLAM STREET CABINET & POWER INSTALLATION plus PCP RESHELL. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site.
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006KNLEPSE00WKNSNGTN-1

A402 Goldhawk Road, London, Hammersmith and Fulham
06 March — 08 March
Delays likely Lane closure
Works location: Unknown
Works description: Install 2m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500275624900

 

A219 Wood Lane, London, Hammersmith and Fulham
15 February — 15 March
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: NEW WASTE WATER AND SEWER CONNECTION, WORKS IN THE FOOTWAY AND CARRIAGEWAY
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU30700050103887-W001
Westway, London, Hammersmith and Fulham
27 February — 23 September
Delays likely Road closure
Works location: Unknown
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432342350

 

 

 

 

 

 

Information supplied by roadworks.org

 

 

 

 

 

 

 

 

 

 

March 4, 2019


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the