Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

A4020 Uxbridge Road, London, Hammersmith and Fulham
18 February — 01 April
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000802012
A402 Goldhawk Road, London, Hammersmith and Fulham
20 February — 20 February
Delays likely Lane closure
Works location: Unknown
Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU600CHB3003-4
B408 Askew Road, London, Hammersmith and Fulham
18 February — 18 February
Delays likely Contra-flow
Works location: Unknown
Works description: Minor, non excavation works. Contraflow system to be installed with all chapter 8 signage, cones and barriers. Cherry picker to access telecoms antenna for testing / maintenance works.
Responsibility for works: Vodafone
Current status: Planned work about to start
Works reference: NX11578978/ERI/STM/KS

 

 

 
A219 Wood Lane, London, Hammersmith and Fulham
15 February — 15 March
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: NEW WASTE WATER AND SEWER CONNECTION, WORKS IN THE FOOTWAY AND CARRIAGEWAY
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU30700050103887-W001
Bentworth Road, London, Hammersmith and Fulham
15 February — 19 February
Delays possible Some carriageway incursion
Works location: Unknown
Works description: B Box Install <33mm Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031236451-001

 

 

 

 

 

 

Information supplied by roadworks.org

 

 

 

 

 

 

 

 

 

 

February 18, 2019


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the