Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

 

A219 Shepherd's Bush Road, London, Hammersmith and Fulham
20 January — 25 January
Delays possible Some carriageway incursion
Works location: Unknown
Works description: SEWER DESCALING PLANNED
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141GFCG--000001
A219 Shepherd's Bush Road, London, Hammersmith and Fulham
23 January — 25 January
Delays likely Lane closure
Works location: Unknown
Works description: Install 6m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500273137802
A402 Goldhawk Road, London, Hammersmith and Fulham
21 January — 24 January
Delays likely Lane closure
Works location: Unknown
Works description: 2x25mm MDPE new water meter supply in in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase, to complete final connection
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU307000807601210045-002
Bloemfontein Road, London, Hammersmith and Fulham
21 January — 21 January
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: S81 EMERGENCY COVER REPLACEMEN--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141FPNC--000002

January 21, 2019


 


 

 

Information supplied by roadworks.org

 

 

 

 

 

 

 

 

 

 

January 21, 2019


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the