Where to expect traffic delays in the days ahead
 A402 Goldhawk Road
      12 October — 17 October 
      Delays likely Traffic control (multi-way signals) 
      Works description: DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. 
      Responsibility for works: Openreach 
Coningham Road
      12 October — 17 October 
      Delays likely Traffic control (multi-way signals)
      Works description: DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. 
      Responsibility for works: Openreach
B408 Askew Road
      12 October — 13 October 
      Delays possible Some carriageway incursion 
      Works description: Thames Water need to carry out works on the water valve. Two way traffic to be maintained for vehicles at all times. Minor Works, No Excavation. 
      Responsibility for works: THAMES WATER 
 Ellingham Road
      12 October — 13 October
       Delays possible Traffic control (Stop/Go boards) 
      Works description: Thames Water need to carry out works on the water valve. Stop & Go boards will be installed to allow these works to be carried out. Minor Works, No Excavation.
      Responsibility for works: THAMES WATER 
October 15, 2018
      
Information supplied by roadworks.org