A40/A3220 West Cross Route, London, Kensington And Chelsea

24 November — 24 November Traffic control (multi-way signals)

Delays likely due to Streetworks
12/168 Tel23318 - Access Tfl Traffic Signal Pole 6, Need To Replace Plated Pole, Pole 6 Feeds Other Poles So Requires Temp Signals To Mimic Existing Lights. 01:00-05:00, Ne/B Lane 1 at A40/A3220

Responsibility: Transport For London

EToN status: Planned work about to start

A4020/A40 Shepherd's Bush Green, London, Hammersmith And Fulham

23 November — 26 November Lane closure

Delays likely due to Streetworks
This Permit Is For Thames, Which Will Involve Carrying Out 4x25mm New Customer Water Supply, Works In The Footway at A4020/A40

Responsibility: Thames Water

EToN status: Planned work about to start

A4020/A40 Shepherd's Bush Green, London, Hammersmith And Fulham

23 November — 27 November Lane closure

Delays likely due to Streetworks
Connections Projects:New Service: (Approx Depth 450mm-600mm):Excavate And Expose Mains Cable For The Installation Of A New 200amp Service. at A4020/A40

Responsibility: UK Power Networks

EToN status: Planned work about to start

A402 Goldhawk Road, London, Hammersmith And Fulham

23 November — 27 November Lane closure

Delays likely due to Streetworks
Connections Projects:New Service: (Approx Depth 450mm-600mm):Excavate And Expose Mains Cable For The Installation Of A New 200amp Service. at A402

Responsibility: UK Power Networks

EToN status: Planned work about to start

Hippodrome Place, London, Kensington And Chelsea

23 November — 27 November Road closure

Delays likely due to Streetworks
- at -

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

A315/B408 Glenthorne Road, London, Hammersmith And Fulham

23 November — 27 November Some carriageway incursion

Delays possible due to Streetworks
Fulcrum To Excavate 1m Square To Connect To Gas Main That Was Laid Previously at A315/B408

Responsibility: Fulcrum Pipelines Limited

EToN status: Planned work about to start

A315 King Street, London, Hammersmith And Fulham

23 November — 24 November Some carriageway incursion

Delays possible due to Streetworks
Remedial Reinstatement at A315

Responsibility: BT

EToN status: Planned work about to start

A315 King Street, London, Hammersmith And Fulham

23 November — 04 December Some carriageway incursion

Delays possible due to Streetworks
Excavate And Replace 23.4 Meters Of 150mm Di Gas Main (Insertion). at A315

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea

23 November — 24 November Some carriageway incursion

Delays possible due to Streetworks
Maintenance - 5.5l X 2.6w Mts Of Blacktop Patch Relay 2 900s X1 Fillet 6 Kerbs P\Artial Lane 1 Closure / Partial Fw Closure at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

A402 Goldhawk Road, London, Hammersmith And Fulham

23 November — 25 November Some carriageway incursion

Delays possible due to Streetworks
Exchange A Manifold In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A402

Responsibility: Thames Water

EToN status: Planned work about to start

A40 Westway, London, Hammersmith And Fulham

23 November — 25 November Some carriageway incursion

Delays possible due to Streetworks
Uneven Paving - 0800 - 1600 at A40

Responsibility: Transport For London

EToN status: Planned work about to start

Bramley Road, London, Kensington And Chelsea

23 November — 25 November Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

Du Cane Road, London, Hammersmith And Fulham

24 November — 26 November Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

Lena Gardens, London, Hammersmith And Fulham

23 November — 27 November Traffic control (give & take)

Delays possible due to Streetworks
- at -

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start


 