Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
|
A219 Wood Lane, London, Hammersmith And Fulham |
10 November — 13 November Traffic control (two-way signals) |
Delays likely due to Streetworks
This Permit Is For Thames Water, Which Will Involve Carrying Out The Disconnection Of 2 Of Water Supplies, Works In The Carriageway at A219 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
|
|
A315 Hammersmith Road, London, Hammersmith And Fulham |
09 November — 11 November Lane closure |
Delays likely due to Streetworks
Repair To A Damaged Network Valve In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A315 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
A40 Westway, London, Hammersmith And Fulham |
09 November — 10 November Lane closure |
Delays likely due to Streetworks
Principal Inspection Of Gantry G2 At Top Of Slip Road In Conjunction With Expansion Joint Inspection. Nearside Lane Closure at A40 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
A40 Westway, London, Hammersmith And Fulham |
09 November — 10 November Road closure |
Delays likely due to Streetworks
Expansion Joints Monitoring Inspection Full Closure & Diversions. 23:59 - 0400. at A40 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
Information supplied by Roadworks.org
November 9, 2015
|