|
|
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
20 July — 31 July Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
20 July — 22 July Traffic control (multi-way signals) |
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling Works In Existing Duct And Box Cleaning. Required For New Customer Connection at A402 |
Responsibility: BT |
EToN status: Planned work about to start |
|
|
|
|
B408 Askew Road, London, Hammersmith And Fulham |
20 July — 22 July Lane closure |
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling Works In Existing Duct And Box Cleaning. Required For New Customer Connection at B408 |
Responsibility: BT |
EToN status: Planned work about to start |
|
|
B408 Dalling Road, London, Hammersmith And Fulham |
20 July — 28 July Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120055 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at B408 |
Responsibility: UK Power Networks |
EToN status: Planned work about to start |
|
|
B408 Paddenswick Road, London, Hammersmith And Fulham |
20 July — 28 July Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120055 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at B408 |
Responsibility: UK Power Networks |
EToN status: Planned work about to start |
|
|
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
20 July — 22 July Some carriageway incursion |
Delays possible due to Streetworks
Capital Programmes:Project::Excavation Of Joint Bays, Cable Installation And Reinstatement at A219 |
Responsibility: UK Power Networks |
EToN status: Planned work about to start |
|
|
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
20 July — 23 July Some carriageway incursion |
Delays possible due to Streetworks
1x63mm Bp Metered New Water Suppy, 9m C/W In Carriageway. Our Intentionis To Complete The Permanent Reinstatement In The Same Phase at A219 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A40/A3220 West Cross Route, London, Kensington And Chelsea |
20 July — 24 July Some carriageway incursion |
Delays possible due to Streetworks
Digital Speed Camera Renewal Scheme - Footway Works - Replacement Of Existing Speed Camera Camera Pole In F/W,Duct Proving, Install Cabinet, Wireless Pole, Trench As Required, Footway Reinstatements, Mount Camera Pole / Cabinet, Completion Of Footway Re-Instatement, Camera Collaboration And Testing. at A40/A3220 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
19 July — 19 July Some carriageway incursion |
Delays possible due to Streetworks
Clear Blockage In Footway And Any Blockage If Found. Footway Works Only. at A4020 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
20 July — 23 July Some carriageway incursion |
Delays possible due to Streetworks
Connections Highway Services:Works For Road Purposes: (Notice For Information Only):Excavate To Expose Service Cable For A New Service To A Feeder Pillar Working On Behalf Of Tfl Street Management? at A4020 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
B408 Askew Road, London, Hammersmith And Fulham |
20 July — 22 July Some carriageway incursion |
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408 |
Responsibility: BT |
EToN status: Planned work about to start |
|
|
B450 Ladbroke Grove, London, Kensington And Chelsea |
20 July — 30 July Some carriageway incursion |
Delays possible due to Streetworks
Paving Works - 650m2 at B450 |
Responsibility: Kensington and Chelsea Royal Borough Council |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
|
|
|