Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

A219 Wood Lane, London, Hammersmith And Fulham
20 July — 21 July Lane closure
Delays likely due to Streetworks
Remedial Reinstatement at A219
Responsibility: Virgin Media
EToN status: Planned work about to start
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham
20 July — 31 July Road closure
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306
Responsibility: Transport For London
EToN status: Planned work about to start
A315 Hammersmith Road, London, Hammersmith And Fulham
20 July — 22 July Lane closure
Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway. at A315
Responsibility: BT
EToN status: Planned work about to start
A402 Goldhawk Road, London, Hammersmith And Fulham
20 July — 22 July Traffic control (multi-way signals)
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling Works In Existing Duct And Box Cleaning. Required For New Customer Connection at A402
Responsibility: BT
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
20 July — 22 July Lane closure
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling Works In Existing Duct And Box Cleaning. Required For New Customer Connection at B408
Responsibility: BT
EToN status: Planned work about to start
B408 Dalling Road, London, Hammersmith And Fulham
20 July — 28 July Traffic control (multi-way signals)
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120055 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at B408
Responsibility: UK Power Networks
EToN status: Planned work about to start
B408 Paddenswick Road, London, Hammersmith And Fulham
20 July — 28 July Traffic control (multi-way signals)
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120055 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at B408
Responsibility: UK Power Networks
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
20 July — 22 July Some carriageway incursion
Delays possible due to Streetworks
Capital Programmes:Project::Excavation Of Joint Bays, Cable Installation And Reinstatement at A219
Responsibility: UK Power Networks
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
20 July — 23 July Some carriageway incursion
Delays possible due to Streetworks
1x63mm Bp Metered New Water Suppy, 9m C/W In Carriageway. Our Intentionis To Complete The Permanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A40/A3220 West Cross Route, London, Kensington And Chelsea
20 July — 24 July Some carriageway incursion
Delays possible due to Streetworks
Digital Speed Camera Renewal Scheme - Footway Works - Replacement Of Existing Speed Camera Camera Pole In F/W,Duct Proving, Install Cabinet, Wireless Pole, Trench As Required, Footway Reinstatements, Mount Camera Pole / Cabinet, Completion Of Footway Re-Instatement, Camera Collaboration And Testing. at A40/A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
19 July — 19 July Some carriageway incursion
Delays possible due to Streetworks
Clear Blockage In Footway And Any Blockage If Found. Footway Works Only. at A4020
Responsibility: Virgin Media
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
20 July — 23 July Some carriageway incursion
Delays possible due to Streetworks
Connections Highway Services:Works For Road Purposes: (Notice For Information Only):Excavate To Expose Service Cable For A New Service To A Feeder Pillar Working On Behalf Of Tfl Street Management? at A4020
Responsibility: Transport For London
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
20 July — 22 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408
Responsibility: BT
EToN status: Planned work about to start
B450 Ladbroke Grove, London, Kensington And Chelsea
20 July — 30 July Some carriageway incursion
Delays possible due to Streetworks
Paving Works - 650m2 at B450
Responsibility: Kensington and Chelsea Royal Borough Council
EToN status: Planned work about to start
Cobbold Road, London, Hammersmith And Fulham
20 July — 30 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
Elgin Avenue, London, Hammersmith And Fulham
20 July — 22 July Traffic control (multi-way signals)
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start
Iffley Road, London, Hammersmith And Fulham
20 July — 22 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Fulcrum Pipelines Limited
EToN status: Planned work about to start
St Ann'S Villas, London, Kensington And Chelsea
20 July — 20 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
West Cross Route (A3220), London, Hammersmith And Fulham
20 July — 24 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Transport For London
EToN status: Planned work about to start
Wingate Road, London, Hammersmith And Fulham
20 July — 22 July Traffic control (multi-way signals)
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 

 

 

 

Information supplied by Roadworks.org

 

 

 

July 20, 2015


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush