Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

A219 Fulham Palace Road, London, Hammersmith And Fulham
06 July — 17 July Road closure
Delays likely due to Streetworks
Anchor Installation. Full Closure Of Fulham Palace Road Northbound And Southbound. at A219
Responsibility: Transport For London
EToN status: Planned work about to start
A219 Queen Caroline Street, London, Hammersmith And Fulham
06 July — 17 July Road closure
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Queen Caroline Street With Agreed Diversion Route. at A219
Responsibility: Transport For London
EToN status: Planned work about to start
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham
06 July — 17 July Road closure
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306
Responsibility: Transport For London
EToN status: Planned work about to start
A315 Hammersmith Road, London, Hammersmith And Fulham
06 July — 10 July Lane closure
Delays likely due to Streetworks
Entry Into Manhole In The Carriageway & One In The Footway Outside 72 & One In Carriageway Outside 149 In Order To Install Mechanical Sleeves & Repair Brickwork To Inner Wall Of Sewer, Night Works Over 5 Nights, Phase 1 Os 72 Signing Only, Phase 2 Oustide 149 Lane Closure, Working For Optimise at A315
Responsibility: Thames Water
EToN status: Planned work about to start
A3220 Holland Road, London, Kensington And Chelsea
06 July — 07 July Lane closure
Delays likely due to Streetworks
Maintenance - Patch - Cracked Patch Around Metal Cover Part Lane 2 Closure at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
07 July — 08 July Lane closure
Delays likely due to Streetworks
11/160 Tel14281 - All Backing Boards On Site X10 Rag Are Faded Require Replacing, Note X4 Backing Boards Are On Six Meter Pole, 22:00-05:00, Ped Access Maintained. at A40
Responsibility: Transport For London
EToN status: Planned work about to start
Bradmore Park Road, London, Hammersmith And Fulham
06 July — 10 July Road closure
Delays likely due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
West Cross Route (A3220), London, Hammersmith And Fulham
07 July — 08 July Lane closure
Delays likely due to Streetworks
- at -
Responsibility: Transport For London
EToN status: Planned work about to start
A3220 Addison Crescent, London, Kensington And Chelsea
06 July — 10 July Some carriageway incursion
Delays possible due to Streetworks
Transfer Service On Columns at A3220
Responsibility: Kensington and Chelsea Royal Borough Council
EToN status: Planned work about to start
A3220 Holland Road, London, Kensington And Chelsea
07 July — 08 July Some carriageway incursion
Delays possible due to Streetworks
Maintenance - Patch - Uneven Cw Surface Area 5m Sq Part Lane 1 And Part F/W Closure at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
06 July — 08 July Some carriageway incursion
Delays possible due to Streetworks
Install New Swept Tee In Footway And Carriageway at B408
Responsibility: Virgin Media
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408
Responsibility: BT
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408
Responsibility: BT
EToN status: Planned work about to start
B415 Elgin Crescent, London, Kensington And Chelsea
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Repair To A Damaged Service Pipe In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at B415
Responsibility: Thames Water
EToN status: Planned work about to start
Coningham Road, London, Hammersmith And Fulham
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Du Cane Road, London, Hammersmith And Fulham
06 July — 08 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 

 

 

Information supplied by Roadworks.org

 

 

 

July 6, 2015


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush