A219 Fulham Palace Road, London, Hammersmith And Fulham |
08 June — 19 June Road closure |
Delays likely due to Streetworks
Anchor Installation. Full Closure Of Fulham Palace Road Northbound And Southbound. at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A219 Queen Caroline Street, London, Hammersmith And Fulham |
08 June — 19 June Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Queen Caroline Street With Agreed Diversion Route. at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
08 June — 10 June Contra-flow |
Delays likely due to Streetworks
11/009 Tel3417 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd5 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) Sb C/W Lane 1 Closed, Traffic Running In N/B Lane 2. Sb Lane 1 Open And F/W To Chamber (Ped Access Maintained) 10.00-15.00, Ped Access Maintained. Van And Additional Equipment Parked In Bay at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
08 June — 19 June Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A3220 Holland Road, London, Kensington And Chelsea |
09 June — 10 June Lane closure |
Delays likely due to Streetworks
Maintenance - Patch - Patch Cracked Cw Area 3m Sq Across Cw Lane 1 Switch Lane 2 Closure at A3220 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A40/A3220 West Cross Route, London, Kensington And Chelsea |
09 June — 10 June Lane closure |
Delays likely due to Streetworks
11/089 Tel23189 - Access Pole 7a On Mast Arm, Red Lamp Out On D Phase. Cherry Picker Needed As 6m Pole. Work Will Take Approx. 30mins, 22:00-05:00, Ped Access Maintained. at A40/A3220 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A40 Westway, London, Hammersmith And Fulham |
09 June — 10 June Lane closure |
Delays likely due to Streetworks
11/160 Tel17994 - Access Pole 3 A Phase Red Lamp Out. Cherry Picker Needed As 6m Pole. Work Will Take Approx. 30mins, 22:00-05:00, Ped Access Maintained. at A40 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
|
|
|
A219 Wood Lane, London, Hammersmith And Fulham |
08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Install 35m Of 1 Way Poly Duct In Footway at A219 |
Responsibility: BT |
EToN status: Planned work about to start |
|
|
A315 Kensington High Street, London, Kensington And Chelsea |
09 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
District Metering X-Bond - Surface B--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A315 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A3220 Addison Road, London, Kensington And Chelsea |
09 June — 15 June Some carriageway incursion |
Delays possible due to Streetworks
Exc In Cw To Repair Blocked Gully at A3220 |
Responsibility: Kensington and Chelsea Royal Borough Council |
EToN status: Planned work about to start |
|
|
A4020/A40 Shepherd'S Bush Green, London, Hammersmith And Fulham |
08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Cabling Works (Splicing And Testing Of Fibre Optic Cables) To Be Carried Out On An Existing Footway Or Carriageway Boxes. at A4020/A40 |
Responsibility: Global Crossing (UK) Telecommunications |
EToN status: Planned work about to start |
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Install New Tee In Footway To Connect New Client at A4020 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Interim To Permanent Reinstatement In Footway at A402 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
|
B450 Ladbroke Grove, London, Kensington And Chelsea |
08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Transfer Service On Column at B450 |
Responsibility: Kensington and Chelsea Royal Borough Council |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
Iffley Road, London, Hammersmith And Fulham |
08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
- at - |
Responsibility: Global Crossing (UK) Telecommunications |
EToN status: Planned work about to start |
|