Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
26 May — 28 May Lane closure |
Delays likely due to Streetworks
11/046 Tel8120 - Slotcut Sd7 Loop, E/B Lane 1 Closed, 1000 - 1500 at A402 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
|
A219 Wood Lane, London, Hammersmith And Fulham |
26 May — 08 June Some carriageway incursion |
Delays possible due to Streetworks
Build 1 Concrete Chamber 2315mm X 737mm X 1565mm Deep In Footway,Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 17m Of 2 Poly Ducts In Footway,Install 3m Of 7 Poly Ducts In Footway at A219 |
Responsibility: BT |
EToN status: Planned work about to start |
|
|
A3220 Addison Crescent, London, Kensington And Chelsea |
26 May — 28 May Some carriageway incursion |
Delays possible due to Streetworks
Transfer Service On Columns at A3220 |
Responsibility: Kensington and Chelsea Royal Borough Council |
EToN status: Planned work about to start |
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
26 May — 28 May Some carriageway incursion |
Delays possible due to Streetworks
Excavate, Remove Existing Phone Kiosk, Backfill And Permanently Reinstate (Where Possible) at A4020 |
Responsibility: BT |
EToN status: Planned work about to start |
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
26 May — 28 May Some carriageway incursion |
Delays possible due to Streetworks
Interim To Permanent Reinstatement In Footway at A402 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
B412 St Mark'S Road, London, Kensington And Chelsea |
26 May — 28 May Some carriageway incursion |
Delays possible due to Streetworks
Lay Duct In Footway And Build Chamber To Connect Client at B412 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
Information supplied by Roadworks.org
May 25, 2015
|