A219 Fulham Palace Road, London, Hammersmith And Fulham |
13 April — 24 April |
Delays likely Road closure |
Works location: A219 |
Works description: Anchor Installation. Full Closure Of Fulham Palace Road Northbound And Southbound. |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
|
A219 Queen Caroline Street, London, Hammersmith And Fulham |
13 April — 24 April |
Delays likely Road closure |
Works location: A219 |
Works description: Local Strengthening Works. Full Closure Of Queen Caroline Street With Agreed Diversion Route. |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
|
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
13 April — 24 April |
Delays likely Road closure |
Works location: A306 |
Works description: Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
|
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
14 April — 16 April |
Delays possible Some carriageway incursion |
Works location: A4020 |
Works description: Lay Duct In Footway To Connect New Client |
Responsibility for works: Virgin Media |
Current status: Planned work about to start |
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
14 April — 16 April |
Delays possible Some carriageway incursion |
Works location: A4020 |
Works description: Repair Patch- Remedial Reinstatement In The Footway |
Responsibility for works: Virgin Media |
Current status: Planned work about to start |
|
|
B408 Dalling Road, London, Hammersmith And Fulham |
13 April — 17 April |
Delays possible Some carriageway incursion |
Works location: B408 |
Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120933 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
Bassett Road, London, Kensington And Chelsea |
13 April — 19 April |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
|
|
Bulwer Street, London, Hammersmith And Fulham |
14 April — 16 April |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: Virgin Media |
Current status: Planned work about to start |
|
|
Iffley Road, London, Hammersmith And Fulham |
13 April — 16 April |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
|