A40/A3220 West Cross Route, London, Kensington And Chelsea |
17 March — 19 March |
Delays likely Road closure |
Works location: A40/A3220 |
Works description: Cpp Cyclical Routine Maintenance Full Closure & Diversions Sb Closure 1703 Nb Closure 1803 2300 To 0500 |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
16 March — 18 March |
Delays likely Lane closure |
Works location: A4020 |
Works description: Self Defect Remedial Works - To Mastic Fwy And Remove Dbm Apply Anti Skid In Cwy As Agreed With Ken Katende |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
|
|
A402 Holland Park Avenue, London, Kensington And Chelsea |
17 March — 17 March |
Delays likely Traffic control (give & take) |
Works location: A402 |
Works description: Removal Of Flow Meters From Manhole In Carriageway, Working For Optimise |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
A402 Holland Park Avenue, London, Kensington And Chelsea |
17 March — 17 March |
Delays likely Traffic control (give & take) |
Works location: A402 |
Works description: Reoval Of Flow Meters From Manhole In Carriageway, Working For Optimise |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
A402 Holland Park Avenue, London, Kensington And Chelsea |
17 March — 17 March |
Delays likely Lane closure |
Works location: A402 |
Works description: Removal Of Flow Meters From Manhole In Carriageway, Working For Optimise |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
|
|
A219 Butterwick, London, Hammersmith And Fulham |
17 March — 19 March |
Delays possible Some carriageway incursion |
Works location: A219 |
Works description: Build 1 Precast Chamber In 915mm X 445mm X 965mm Deep In Footway,Install 7m Of 1 Way Poly Duct In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A219 Fulham Palace Road, London, Hammersmith And Fulham |
17 March — 25 March |
Delays possible Some carriageway incursion |
Works location: A219 |
Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120844 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
16 March — 19 March |
Delays possible Some carriageway incursion |
Works location: A219 |
Works description: Disconnection In Carriageway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
A315 Beadon Road, London, Hammersmith And Fulham |
16 March — 18 March |
Delays possible Some carriageway incursion |
Works location: A315 |
Works description: To Make Perm In Fwy |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
A315 King Street, London, Hammersmith And Fulham |
16 March — 18 March |
Delays possible Some carriageway incursion |
Works location: A315 |
Works description: 1 ,Install 1m Of 1 Way Poly Duct In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
17 March — 19 March |
Delays possible Some carriageway incursion |
Works location: A402 |
Works description: Install 8m Of 1 Way Poly Duct In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
17 March — 19 March |
Delays possible Some carriageway incursion |
Works location: A402 |
Works description: Remedial Works Following Defect Inspection - To Rectify Cracked Flag In Fwy |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
A402 Holland Park Avenue, London, Kensington And Chelsea |
16 March — 27 March |
Delays possible Some carriageway incursion |
Works location: A402 |
Works description: Approx 50m. Hv Duct And Cable Install Within F/W, Across Kingham Close Jnc & Entrance To Hilton Hotel, Both To Be Done Half/Half. Pedestrians To Be Diverted Through Hilton Hotel Forecourt When Undertakening Section Outside Hilton As Agreed With Manager. Whilst Undertaking Sec Btwn Kingham Close & Clearwater Terrace, Peds Will Use Ped Walkway Provided In C/W As Per Tm Drawing Km189. Works To Be Undertaken In Small Sections To Minimise Disruption. Tm Approval: A2903-030315/28 |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Planned work about to start |
|
|
|
|
|