If you look at the documents for the September 2023 Hounslow cabinet meeting there is a proposed package of additional changes for C9 including replacing wands with kerbs, changes to the junction at CHR/Heathfield Terrace, cycle and pedestrian crossing between C9 and Windmill Rd.However it also includes removal of the bus gate at Acton Lane and TfL don’t want to do that so there is a bit of an impasse and it remains to be seen what will actually go ahead.
Michael Robinson ● 75d