Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
TfL Now Saying Hammersmith Bridge Closed 'Indefinitely'
Bitter row rumbles on as to who is to pay for the repairs
Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
21 May — 28 May |
||
Delays likely Lane closure |
||
Works location: Unknown |
||
Works description: LAY NEW DOMESTIC SERVICE FROM MAIN IN THE NEARSIDE FOOTWAY FEEDING TO13FLAT 3A CHISWICK HIGH ROAD |
||
Responsibility for works: Cadent |
||
Current status: Planned work about to start |
||
Works reference: AZ0071000831171 |
20 May — 26 May |
||
Delays likely Lane closure |
||
Works description: Access required to Underground BT structure to REPAIR service - No structural changes. Work being carried out on existing BT Plant |
||
Responsibility for works: Openreach |
||
Current status: Planned work about to start |
||
Works reference: BC005CC1W0011FEBIBY068PF |
15 May — 21 May |
||
Delays likely Traffic control (multi-way signals) |
||
Works description: LAY NEW SERVICE FROM MAIN IN FARSIDE CARRIAGEWAY |
||
Responsibility for works: Cadent |
||
Current status: Planned work about to start |
||
Works reference: AZ0071000831297 |
|
|
|
Source: www.roadworks.org
May 21, 2019