Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
13 September — 23 September |
||
Delays likely Traffic control (two-way signals) |
||
Works location: B409 |
||
Works description: Dslam Street Cabinet & Power Installation Plus Pcp Reshell. Excavate To Lay Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. |
||
Responsibility for works: BT |
||
Current status: Planned work about to start |
|
|
||||||||||
|
||||||||||
|
||||||||||
|
Source: www.roadworks.org
September 22, 2017