Traffic Delays Likely in Chiswick
Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
A406 Gunnersbury Avenue (North Circular Road) |
16 September — 17 September |
|
|
Delays likely Contra-flow |
|
Works location: A406 |
|
|
Works description: Closure Of One Lane In Both Directions, Maintaining Traffic Flow With One Lane In Both Directions To Facilitate The Removal Of The Central Island Opposite Power Road. |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
B490 Acton Lane |
15 September — 17 September |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: B490 |
|
|
Works description: Build 2 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Demolish 2 Existing Jointbox(S) Or Cabinet Base(S),Install 18m Of 1 Way Poly Duct In Footway |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
B409 Bath Road, Chiswick |
13 September — 23 September |
Delays likely Traffic control (two-way signals) |
Works location: B409 |
Works description: Dslam Street Cabinet & Power Installation Plus Pcp Reshell. Excavate To Lay Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. |
Responsibility for works: BT |
Current status: Planned work about to start |
B409 Bath Road, Chiswick |
14 September — 18 September |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: B409 |
|
|
Works description: Excavate Footway To Install New Chambers On Existing Track |
|
|
Responsibility for works: Virgin Media |
|
|
Current status: Planned work about to start |
|
|
Town Hall Avenue, Chiswick |
12 September — 22 September |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
A315 Chiswick High Road, Chiswick |
01 September — 30 September |
Delays likely Road closure |
Works location: A315 |
Works description: Pfi - C/W Resurfacing |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
British Grove, Chiswick |
1 September — 30 September |
Delays likely Road closure |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
A3000 Sutton Lane North, Chiswick |
07 September — 20 September |
Delays likely Road closure |
Works location: A3000 |
Works description: Pfi C/W Resurfacing |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
A205 Chiswick High Road (North Circular Road), Chiswick |
22 August — 22 September |
Delays likely Lane closure |
Works location: A205 |
Works description: Approx 106m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Bus Lane Suspension. Lane Closure Is Required Due To Banned Left Movement. |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Advanced planning |
|
Source: www.roadworks.org
September 15, 2017
|