Traffic Delays Likely in Chiswick
Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area
Tailbacks Likely on North Circular Due to Lane Closures - 3-7 June
A406 Gunnersbury Avenue (North Circular Road) |
03 June — 04 June |
Delays likely Contra-flow |
Works location: A406 |
Works description: Closure Of One Lane In Both Directions, Maintaining Traffic Flow With A Contraflow System To Facilitate Carriageway Surfacing Near Junction With Power Road. The Contraflow Will Be On The Western Side Of The Main Bridge. |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
Kew Bridge Road, Brentford |
03 June — 04 June |
Delays likely Lane closure |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
Sutton Court Road, Chiswick |
02 June — 02 June |
Delays likely Traffic control (Stop/Go boards) |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
Chiswick High Road, Chiswick |
16 May — 02 June |
Delays likely Traffic control (multi-way signals) |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
Chiswick High Road, Chiswick |
16 May — 02 June |
Delays likely Traffic control (multi-way signals) |
Responsibility for works: Hounslow London Borough Council |
Current status: Planned work about to start |
|
Sutton Court Road, Chiswick |
02 June — 02 June |
Delays likely Traffic control (Stop/Go boards) |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
Source: www.roadworks.org
June 2, 2017
|