Traffic Delays Likely in Chiswick


Forthcoming significant roadworks in the W4 area

The following roadworks are likely to cause some delays in the Chiswick area.

Fisher's Lane To Be Closed For Four Weeks

Fisher's Lane To Be Closed For Four Weeks

M4

19 September — 23 September

Delays likely Some carriageway incursion

Works location: Type : Awp : Location : The M4 Westbound Between Junctions J1 And J3 : Lane Closures : Lanes 1 And 2 Will Be Closed : Reason : Roadside Drains Works Are Planned : Status : Pending : Schedule : Expect Disruption Everyday Between 22:00 And 05:00 From 19 September 2016 To 23 September 2016 : Lanes Closed : All Lanes Will Be Closed

Works description: -

Responsibility for works: Highways England

Current status: Planned work about to start

Kew Bridge Road, Brentford

21 September — 22 September

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

A4 Great West Road, Brentford

19 September — 30 September

Delays likely Lane closure

Works location: A4

Works description: 22:30 To 05:00hrs. Lane 1 And 2 Closure Or A Lane 3 And 2 Closure Westbound For Delaminated Concrete Surveys Of The A4 Piers (Pier 1 To Pier 31)

Responsibility for works: Highways England

Current status: Planned work about to start

Acton Lane, Chiswick

20 September — 22 September

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: Ealing London Borough Council

Current status: Planned work about to start

Pumping Station Road, Chiswick

14 September — 22 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hounslow London Borough Council

Current status: Planned work about to start

Rusthall Avenue, Chiswick

12 September — 17 October

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: National Grid Gas Plc

Current status: Planned work about to start

A307/A205 Kew Road, Kew

05 September — 06 November

Delays likely Contra-flow

Works location: A307/A205

Works description: Refurbishment And Replacement Of Service Bay Cover Slabs

Responsibility for works: Transport For London

Current status: Planned work about to start

A4 Great West Road, Brentford

17 August — 29 September

Delays likely Road closure

Works location: A4

Works description: Carriageway Resurfacing

Responsibility for works: Transport For London

Current status: Advanced planning

A307/A205 Kew Road, Kew

01 August — 25 September

Delays likely Road closure

Works location: A307/A205

Works description: Installation Of Temporary Barriers, Refurbishment And Replacement Of Service Bay Cover Slabs

Responsibility for works: Transport For London

Current status: Advanced planning

Source: www.roadworks.org

September 22, 2016