Traffic Delays Likely in Chiswick


Planned roadworks in the W4 area

The following roadworks are likely to cause some delays in the Chiswick area: Some may not cause delays but residents may be interested to know of work going on in advance.

A315 Chiswick High Road, Chiswick

14 December — 16 December Traffic control (multi-way signals)

Delays likely due to Streetworks
Sewer Cleaning Works - Non Excavation at A315

Responsibility: Thames Water

EToN status: Planned work about to start

A406 Gunnersbury Avenue (North Circular Road)

14 December — 15 December Lane closure

Delays likely due to Streetworks
Wp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Nearside Lane Closure With Offside Lane Running - All Vehicle Movements Maintained - 2200 - 0500 at A406

Responsibility: Transport For London

EToN status: Planned work about to start

A406 Gunnersbury Avenue (North Circular Road)

14 December — 15 December Lane closure

Delays likely due to Streetworks
Wp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Nearside Lane Closure With Offside Lane Running - All Vehicle Movements Maintained - 2200 - 0500 at A406

Responsibility: Transport For London

EToN status: Planned work about to start

Lionel Road South, Brentford

13 December — 15 December Road closure

Delays likely due to Streetworks
- at -

Responsibility: Hounslow London Borough Council

EToN status: Advanced planning

Spring Grove, Chiswick

07 December — 04 January 2016 Road closure

Delays likely due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Advanced planning

Source: www.roadworks.org

December 14, 2015