Traffic Delays Likely in Chiswick


Planned roadworks in the W4 area

The following roadworks are likely to cause some delays in the Chiswick area:

 
     
     
     
     

B409 Bath Road, Chiswick, London, London Borough Of Hounslow

16 July — 20 July Traffic control (give & take)

Delays likely due to Streetworks
W.R.P. - Installation Of 3 Bay Non Ad Bus Shelter, Back Of Path, For And On Behalf Of Transport For London 0118/4698 2360660 at B409

Responsibility: London Transport

EToN status: Planned work about to start

Chiswick Village, Chiswick, London, London Borough Of Hounslow

16 July — 21 July Road closure

Delays likely due to Streetworks
- at -

Responsibility: Hounslow London Borough Council

EToN status: Advanced planning

A406 Gunnersbury Avenue (North Circular Road), London, London Borough Of Hounslow

16 July — 24 July Some carriageway incursion

Delays possible due to Streetworks
Excavation Required For New 1? Phase Domestic Lv Supply. Work Involved: 1 X Joint Hole& 3m Trench. To Be Reinstated On Completion Of Works at A406

Responsibility: Southern Electric

EToN status: Planned work about to start

A4 Chiswick Roundabout, Chiswick, London, London Borough Of Hounslow

10 July — 10 July Some carriageway incursion

Delays possible due to Streetworks
Nrw Grass/Hedge/Weeds Pedestrian Signing Ligthing & Guarding Only - No Carriageway Incursion Nb/Sb 09:30 To 16:00 at A4

Responsibility: Transport For London

EToN status: Planned work about to start

Power Road, Chiswick, London, London Borough Of Hounslow

11 July — 12 July Traffic control (two-way signals)

Delays possible due to Streetworks
- at -

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

B491 Southfield Road, Chiswick, Ealing

10 July — 13 July Some carriageway incursion

Delays unlikely due to Streetworks
Interim To Permanent Reinstatement In Footway Only at B491

Responsibility: Virgin Media

EToN status: Planned work about to start

Castle Close, Acton, Ealing

10 July — 20 July Some carriageway incursion

Delays unlikely due to Streetworks
- at -

Responsibility: Southern Electric

EToN status: Planned work about to start

Fairlawn Avenue, Chiswick, Ealing

10 July — 10 July Some carriageway incursion

Delays unlikely due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

Grove Park Road, Chiswick, London, London Borough Of Hounslow

10 July — 14 July Some carriageway incursion

Delays unlikely due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

Hartington Road, Chiswick, London, London Borough Of Hounslow

10 July — 14 July Some carriageway incursion

Delays unlikely due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

Kingswood Road, Chiswick, Ealing

10 July — 13 July Some carriageway incursion

Delays unlikely due to Streetworks
- at -

Responsibility: Virgin Media

EToN status: Planned work about to start

Newton Avenue, Acton, Ealing

10 July — 13 July Some carriageway incursion

Delays unlikely due to Streetworks
- at -

Responsibility: Virgin Media

EToN status: Planned work about to start

Welstead Way, Chiswick, London, London Borough Of Hounslow

11 July — 14 July Some carriageway incursion

Delays unlikely due to Streetworks
- at -

Responsibility: Virgin Media

EToN status: Planned work about to start

 

A406 Gunnersbury Avenue (North Circular Road)

05 May — 09 September

Delays likely Lane closure

Works location: A406

Works description: Install 140m Of 24 Poly Ducts In Carriageway

Responsibility for works: BT

Current status: Advanced planning

A4/A3005 Great West Road, Brentford

07 March — 30 November

Delays likely Lane closure

Works location: A4/A3005

Works description: Strengthening Works At Piers 19,20& 30 And 38-103 On The A4 Great West Rd With Night Time Lane Closures Between Chiswick ( Larch Drive & Boston Manor Rd During The Hours Of 10.30pm To 05.00am Mondays-Sundays Inclusive. Lane Closures Will Be A Lane 1 & 2 Closure With Lane 3 Running Or A Lane 2 & 3 Closure With Lane 1 Running Both East And West Bound On The A4 . See Package 3 Works Location Drawing Attached : Drawing 5103542/Dr/St/Wp3/001 Coordinated With Hammersmith Flyover

Responsibility for works: Highways Agency

Current status: Planned work about to start

 

Source: www.roadworks.org

July 10, 2015