Traffic Delays Likely in Chiswick


Planned roadworks in the W4 area

The following roadworks are likely to cause some delays in the Chiswick area:

Hogarth Flyover To Be Closed For Summer

Putney Bridge Closure Date Confirmed

Major Work Begins On Chiswick Bridge

Thames Road, Chiswick

28 August — 09 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hounslow London Borough Council

Current status: Advanced planning

M4

01 September — 05 September

Delays likely Some carriageway incursion

Works location: The M4 Eastbound Will Be Closed Between Junctions J3 And J1, Due To Roadworks, From 10 Pm On 1 September 2014 To 5 Am On 5 September 2014.

Works description: -

Responsibility for works: Highways Agency

Current status: Planned work about to start


A315 Chiswick High Road, Chiswick

03 September — 05 September

Delays likely Traffic control (multi-way signals)

Works location: A315

Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start


Thames Road, Chiswick

28 August — 09 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hounslow London Borough Council

Current status: Advanced planning

Spencer Road, Chiswick

22 August — 04 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hounslow London Borough Council

Current status: Planned work about to start


Devonshire Gardens, Chiswick

26 August — 05 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hounslow London Borough Council

Current status: Advanced planning



B4491 Popes Lane, Ealing
24 July - 10 January 2015
Delays likely Lane closure
Location : B4491 Description : To excavate trench lay ducting for future cable lay, jointbays will be required and install ducting for 132KV and will replace the exisiting oil filled cables, jointbays will be app 12 meters by 4 meters wide, the route will be ducted and jointbays dug seperately, works will involve weekend works and nights if requested, mostly lane closure, small pinchpoint poss closure Traffic lights, etc

B490 Acton Lane, Chiswick -POSTPONED

20 August — 04 September

Delays likely Road closure

Works location: B490

Works description: Imga140635 (Mark Branch) Abandon 9 Metres Of 6" Si And Insert/Open Cut 9metres Of 90mm Pe Main. No Services To Relay/Transfer

Responsibility for works: National Grid Gas Plc

Current status: Advanced planning


Great West Road, Brentford

09 June — 31 October

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

Gunnersbury Avenue (North Circular Road)

02 June — 30 November 2015

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

 

Source: www.roadworks.org

September 2, 2014

 

<