Planned roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area:
Hogarth Flyover To Be Closed For Summer
Putney Bridge Closure Date Confirmed
Major Work Begins On Chiswick Bridge
28 August — 09 September |
||
Delays likely Road closure |
||
Works location: - |
||
Works description: - |
||
Responsibility for works: Hounslow London Borough Council |
||
Current status: Advanced planning |
01 September — 05 September |
||
Delays likely Some carriageway incursion |
||
Works location: The M4 Eastbound Will Be Closed Between Junctions J3 And J1, Due To Roadworks, From 10 Pm On 1 September 2014 To 5 Am On 5 September 2014. |
||
Works description: - |
||
Responsibility for works: Highways Agency |
||
Current status: Planned work about to start |
03 September — 05 September |
||
Delays likely Traffic control (multi-way signals) |
||
Works location: A315 |
||
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
||
Responsibility for works: Thames Water |
||
Current status: Planned work about to start |
|
22 August — 04 September |
||
Delays likely Road closure |
||
Works location: - |
||
Works description: - |
||
Responsibility for works: Hounslow London Borough Council |
||
Current status: Planned work about to start |
26 August — 05 September |
||
Delays likely Road closure |
||
Works location: - |
||
Works description: - |
||
Responsibility for works: Hounslow London Borough Council |
||
Current status: Advanced planning |
|
B490 Acton Lane, Chiswick -POSTPONED |
||
20 August — 04 September |
||
Delays likely Road closure |
||
Works location: B490 |
||
Works description: Imga140635 (Mark Branch) Abandon 9 Metres Of 6" Si And Insert/Open Cut 9metres Of 90mm Pe Main. No Services To Relay/Transfer |
||
Responsibility for works: National Grid Gas Plc |
||
Current status: Advanced planning |
09 June — 31 October |
||
Delays likely Lane closure |
||
Works location: - |
||
Works description: - |
||
Responsibility for works: Transport For London |
||
Current status: Advanced planning |
|
Source: www.roadworks.org
September 2, 2014