| A3000 Heathfield Terrace, Chiswick, London, Hounslow |
| 07 April — 07 April |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Pulling through Cables and Fibre (Traffic Light Head) |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005HU789WNMARZE-CHI41C |
|
|
| A307,A205 Kew Road, Kew, Richmond upon Thames |
| 05 April — 06 April |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: pothole repairs |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG434LB0106000060368 |
|
|
| B455 Ealing Green, Ealing, Ealing |
| 07 April — 07 April |
| Delays likely Traffic control (Stop/Go boards) |
| Works location: Unknown |
| Works description: THESE WORKS ARE FOR THE ESSENTIAL UPGRADING OF EXISTING COMMUNICATIONS EQUIPMENT. WORKS ARE INSIDE THE EXISTING CABINETS ONLY. THESE WORKS WILL NOT REQUIRE EXCAVATION. |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SCL0MA/3E03A08T12 |
|
|
| A3000 Sutton Lane North, Chiswick, London, Hounslow |
| 07 April — 07 April |
| Delays possible Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Pulling Through Cables and Fibre (Traffic Light Head) |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005HU789WNMARZE-CHI41B |
|
|
| A3000 Wellesley Road, Chiswick, London, Hounslow |
| 07 April — 07 April |
| Delays possible Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Pulling through Cables and Fibres |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005HU789WNMARZE-CHI41A |
|
|
| A315 London Road, Brentford, Hounslow |
| 06 April — 08 April |
| Delays possible Lane closure |
| Works location: Unknown |
| Works description: Service Pipe Repair in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031236571-001 |
|
|
| Heathfield Gardens, Chiswick, London, Hounslow |
| 07 April — 07 April |
| Delays possible Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Pulling Through Cables and Fibre (Traffic Light Head) |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005HU789WNMARZE-CHI41D |
|
|
| Montgomery Road, Chiswick, Ealing |
| 05 April — 05 April |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Unknown |
| Works description: Thames Water need to carry out works on the water valve. Stop & Go will be installed to allow these works to be carried out. Minor Works, No Excavation. |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU150WO-24068657/TW |
|
|
| Walpole Gardens, Chiswick, London, Hounslow |
| 07 April — 07 April |
| Delays possible Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Pulling through Cables and Fibres |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005HU789W0NMARZE-CHI41 |
|
|
| A205 Mortlake Road, Kew, Richmond upon Thames |
| 06 April — 06 April |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: 24/704 - TEL0216991 - Dig trial hole to test depth within 4m of existing OVD pole as TFL are looking to relocate following repeat RTA's - 10.00 - 15.00 |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG516S000000004652 |
|
|
| Aplin Way, Isleworth, Hounslow |
| 05 April — 08 April |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: NEW CUSTOMER CONNECTION-CLEAR BLOCKAGE IN FOOTWAY |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSSMRE/100277905 |
|
|
| Brook Lane North, Brentford, Hounslow |
| 05 April — 08 April |
| Delays unlikely Traffic control (give & take) |
| Works location: Unknown |
| Works description: Remedial reinstatement |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSEMFI/100268164 |
|
|
| Devonshire Road, Ealing, Ealing |
| 05 April — 05 April |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: THESE WORKS ARE FOR THE ESSENTIAL UPGRADING OF EXISTING COMMUNICATIONS EQUIPMENT. WORKS ARE INSIDE THE EXISTING CABINETS ONLY. THESE WORKS WILL NOT REQUIRE EXCAVATION. |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SCL0MA/E03A01T09 |
|
|
| Grange Park, Ealing, Ealing |
| 05 April — 09 April |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Serv Pipe Relay Ex Fitting Sz P f/way and in Carriageway. Our intentionis to complete the Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031266096-001 |
|
|
| Leyborne Avenue, West Ealing, Ealing |
| 05 April — 11 April |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: DISCONNECT 1 X 32MM PE GAS SERVICE FROM MAIN IN THE CARRIAGEWAY |
| Responsibility for works: Cadent |
| Current status: Planned work about to start |
| Works reference: AZ0071000820505 |
|
|
| Overdale Road, Ealing, Ealing |
| 05 April — 09 April |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: WATER METER INSTALLATION IN FOOTWAY |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU039NOT-215892 |
|
|
| Silver Crescent, Chiswick, London, Hounslow |
| 05 April — 09 April |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: Outside stop valve installation in footway |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU275OSV-215625 |
|
|
| Somerset Road, West Ealing, Ealing |
| 05 April — 09 April |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: CUSTOMER SIDE LEAKAGE REPAIR |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU356002141GZCQ--000001 |
|
|
| Station Parade, Richmond, Richmond upon Thames |
| 07 April — 07 April |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Kew Village Market |
| Responsibility for works: Richmond upon Thames |
| Current status: Planned work about to start |
| Works reference: KP222S0000EVENT005 |
|
|
| Wyndham Road, West Ealing, Ealing |
| 06 April — 14 April |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Works in footway and carriageway to carry out Service pipe relay between the existing Water main and Fielding Primary School boundary, as part of Thames Water's Lead Pipe Replacement Project. |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU276IA/AMP6/SCH/EAL/303 |
|