| A315 London Road, Isleworth, Hounslow |
| 28 August — 30 August |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: Install 13m of 1 way poly duct in Footway,Install 9m of 1 way poly duct in Carriageway,Provide 2 core drill(s) into jointbox or building |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500268980403 |
|
|
| A4 Great West Road, Brentford, Hounslow |
| 29 August — 30 August |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: Resurfacing |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG430404508 |
|
|
| A4 Great West Road, Brentford, Hounslow |
| 30 August — 31 August |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: 25/286 TEL0238155 - Access TfL traffic signal pole 14, complete a bulk lamp change. 23:00-05:00. E/B lane 1. Short stay works, approx 15 mins on site. No noisy works involved |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG516S000000005074 |
|
|
| A4 Great West Road, Brentford, Hounslow |
| 30 August — 31 August |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: Resurfacing |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG430404528 |
|
|
| B452 Windmill Road, Ealing, Ealing |
| 29 August — 29 August |
| Delays possible Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: PERM REINSTATEMENT IN THE CARRIAGEWAY |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU026002141HMPN--000001 |
|
|
| Brooks Road, Chiswick, London, Hounslow |
| 29 August — 29 August |
| Delays possible Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Remedial reinstatement in the carriageway |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031239129-001 |
|
|
| A205,A315 Kew Road, Chiswick, Richmond, Hounslow |
| 30 August — 01 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: Build 1 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 55m of 2 poly ducts in Footway |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500282960004 |
|
|
| A3000 Wellesley Road, Chiswick, London, Hounslow |
| 30 August — 02 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: NEW CUSTOMER CONNECTION - INSTALL TEE IN FOOTWAY |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSSMRE/100299028 |
|
|
| A307,A205 Kew Road, Kew, Richmond upon Thames |
| 30 August — 01 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: Build 2 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Demolish 2 existing jointbox(s) or cabinet base(s),Install 55m of 2 poly ducts in Footway |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500282960005 |
|
|
| A315,A205 Kew Bridge Road, Brentford, Hounslow |
| 28 August — 28 August |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: EXCAVATE IN F/W TO LOCATE VALVE AND ENSURE ITS OPERATIONAL, BACK FILL AND REINSTATE. |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU277MV6943066-01 |
|
|
| A315 Chiswick High Road, Chiswick, London, Hounslow |
| 29 August — 30 August |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: CLEAR BLOCKAGE IN FOOTWAY |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSSMRE/100301991 |
|
|
| A4 Great West Road, Brentford, Hounslow |
| 30 August — 30 August |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: FAILED DBM CYCLE TRACK- 17.60M DBM PATCH |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG430405579 |
|
|
| Abelard Place, Ealing, Ealing |
| 28 August — 30 August |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Install 1m of 1 way poly duct in Carriageway |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500285163300 |
|
|
| Dancer Road, Richmond, Richmond upon Thames |
| 28 August — 30 August |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: INSTALL NEW OUTSIDE STOP VALVE IN FOOTWAY |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU274002252GQDX--000002 |
|
|
| Elthorne Park Road, Hanwell, Ealing |
| 29 August — 02 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: Install 7m of 1 way poly duct in Footway |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500285111100 |
|
|
| Fairlawn Avenue, Chiswick, Ealing |
| 28 August — 05 September |
| Delays unlikely Traffic control (give & take) |
| Works location: Unknown |
| Works description: Excavate 1 x Joint Hole, 7m Road crossing and 3m of Trench for new 3Ø LV Domestic electricity supply. Backfill & reinstate. |
| Responsibility for works: Scottish and Southern Power Distribution |
| Current status: Planned work about to start |
| Works reference: LP551S30003484 |
|
|
| Gloucester Road, Kew, Richmond upon Thames |
| 28 August — 30 August |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Concrete column replacement. (1) Replace column complete x 10. with new MBA cast columns with root and cleghorne glass galzed hampstead lanterns . Details as per column fact finding information sheet. |
| Responsibility for works: Richmond upon Thames |
| Current status: Planned work about to start |
| Works reference: KP703WKS442334 |
|
|
| Haslemere Avenue, West Ealing, Ealing |
| 29 August — 31 August |
| Delays unlikely Traffic control (give & take) |
| Works location: Unknown |
| Works description: CLEAR BLOCKAGE IN FOOTWAY TO ALLOW CUSTOMER CONNECTIONS |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SCLJBU/120503/LBC |
|
|
| Hawthorn Gardens, Ealing, Ealing |
| 28 August — 30 August |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031328189-001 |
|
|
| Heathfield Gardens, Chiswick, London, Hounslow |
| 28 August — 30 August |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU356002141JSQM--000001 |
|
|
| Loveday Road, West Ealing, Ealing |
| 29 August — 02 September |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Service Pipe Repair in Footway. Our intention is to complete thePermanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031339994-001 |
|
|
| Roxborough Avenue, Isleworth, Hounslow |
| 30 August — 03 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: Install 1m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500285421000 |
|
|
| Stirling Road, Acton, Ealing |
| 28 August — 30 August |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Service Pipe Repair Ftway & in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031337589-001 |
|
|
| The Park, Ealing, Ealing |
| 28 August — 30 August |
| Delays unlikely Traffic control (priority working) |
| Works location: Unknown |
| Works description: Service Pipe Repair <33mm Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031208414-001 |
|
|